Green Way Systems

You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialise correctly.

  

Get latest Adobe Flashplayer here!

staucon logo

the "costum-made" traffic control system for temporary operation e.g. before roadwork zones

  • Modular Method of construction
    enables flexible adaptation to location
  • Low expenditure
    for assembly, dismantling and realization of project
  • Independent energy supply
    via solar panels. Electricity supply from grid is optional available.
  • Data radio transmission
    mobile wireless communication in realtime between modules on the road and central control unit. No expensive wiring needed - all communication over GSM/GPRS!
  • Reliable data collection
    by infrared detectors at roadside